Technicians working at Linton’s Iden site have successfully added a bespoke Programmable Logic Controller (PLC) to enhance the customer facing properties of the project system.
The brief from our client was to incorporate existing and new instrumentation into a brand new PLC, which allowed greater control and status over the incoming site flow.
The PLC system developed by Linton provides easy access to system operating data and shows trend lines over time that allows more detailed analysis. Linton technicians have also incorporated telemetry to remotely notify the client of status and condition.
In addition to the new PLC system, the Linton team swapped out the existing Direct On-line Starters for new Variable Speed Drive pumps, allowing for much greater control over speed of flow in order to deliver significant improvements in energy efficiency.
For more information on how Linton can deliver service enhancements to your business contact enquiries@lintonelectrical.co.uk or call 01622 873 333
It has been a busy year for Linton. With two key appointments and a growing project list, the team at Linton has also been developing its skill base in several key areas.
“The electrical contracting sector is constantly developing ever more sophisticated ways of working to meet market and client demands,” comments Project Manager, Brent Smith. “Industry is constantly looking at ways in which technology and infrastructure can meet markt challenges. Linton has a robust employee development programme through which our engineers are constantly enhancing their skills and methods of practice.”
The team at Linton have several decades years of industry experience between them and training reflects the changing needs of the industry and client requirements.